What is the ADEETIE Scheme? (Full Form Explained)
ADEETIE stands for Assistance in Deploying Energy Efficient Technologies in Industries & Establishments. It is a Ministry of Power scheme implemented by the Bureau of Energy Efficiency (BEE). Some official BEE material also uses the wording Assistance for Deployment of Energy Efficient Technologies in Industrial Establishments.
What is the Duration of the ADEETIE Scheme?
The ADEETIE Scheme implementation period is FY 2025-26 to FY 2027-28. Interest subvention is payable for three years irrespective of loan tenure, subject to scheme conditions. Committed liability may continue up to FY 2030-31.
Objectives & Benefits of the ADEETIE Scheme
- Reduce Energy Intensity: Help MSMEs lower energy costs through energy-efficient technologies identified for the eligible project with minimum 10% energy savings
- India’s NDC Targets: Aligns with India’s Nationally Determined Contributions under the Paris Agreement and Viksit Bharat energy roadmap
- Reduce Financial Burden: 5% subvention for Micro/Small and 3% for Medium enterprises makes technology upgrades affordable
- End-to-End Support: BEE Facilitation Centre provides handholding for IGEA coordination, DPR processing, financing support and post-implementation M&V/MRV
- Interest Subvention: 5% interest subvention on eligible loans for Micro and Small enterprises and 3% for Medium enterprises, for three years irrespective of loan tenure. Eligible loan range: ₹10 lakh to ₹15 crore. Debt funding up to 75% of project cost qualifies, subject to a minimum net borrowing interest rate of 2%.
- IGEA Cost Reimbursement: IGEA support is reimbursed on an actual basis, up to ₹75,000 for Micro and Small enterprises and ₹1 lakh for Medium enterprises per project or loan. Reimbursement is not a guarantee of zero cost.
- DPR Preparation Support: Technical audit and DPR support is available under the scheme, subject to the applicable process and reimbursement limits.
- New Projects Only: Interest subvention is not available for projects already implemented, refinanced, or already benefited under another scheme.
- Potential Energy Savings: Actual energy savings and payback vary by technology, baseline, project design and implementation. ADEETIE requires projects to achieve and sustain at least 10% energy savings for annual interest subvention; illustrative technology estimates should not be treated as guaranteed results.
- Remember: The approved ADEETIE outlay is ₹1,000 crore across interest subvention, IGEA support and implementation/handholding support.
ADEETIE Scheme Nodal Ministry & BEE
Which Ministry Launched ADEETIE?
The Ministry of Power, Government of India is the nodal ministry responsible for policy formulation and overall supervision of the ADEETIE Scheme. The scheme aligns with India’s Nationally Determined Contributions (NDCs) under the Paris Agreement and the Viksit Bharat energy efficiency roadmap.
Which Ministry is BEE Under?
The Bureau of Energy Efficiency (BEE) is a statutory body established under the Energy Conservation Act, 2001, functioning under the Ministry of Power. BEE is the designated implementing agency for ADEETIE and manages the full technical and financial process.
What Does BEE Manage for ADEETIE?
- Certified Energy Auditors: Empanelment of Certified Energy Auditors and Accredited Energy Audit Firms for IGEA
- IGEA & DPR Review: Investment Grade Energy Audit is the technical assessment, followed by Detailed Project Report preparation and review under the scheme process.
- MRV / M&V of Energy Savings: Monitoring, Reporting, and Verification of actual energy savings post-implementation
- Participating FI Coordination: Coordination with participating financial institutions under ADEETIE for interest-subvention processing and disbursement to eligible MSMEs.
- BEE Facilitation Centre: MSME handholding support for EOI filing, IGEA/DPR coordination, financing and post-implementation monitoring and verification.
What is the Budget of ADEETIE?
The total approved outlay for the ADEETIE Scheme is ₹1,000 Crore. The official allocation is:
- Budget Covers: • ₹875 crore for interest subvention • ₹50 crore for IGEA support
- Administrative Costs: • ₹75 crore for handholding and implementation support • Scheme implementation across the notified clusters and eligible sectors
What is BEE Full Form? BEE stands for Bureau of Energy Efficiency. It is the government body responsible for developing policies and strategies to reduce energy intensity in the Indian economy. Official portal: beeindia.gov.in
ADEETIE Scheme Eligibility Criteria 2026
Key Eligibility and Exclusion Checks
Not eligible: a project already implemented, a refinanced project, a project already benefited under another scheme, and a loan account declared NPA. The project must achieve and sustain at least 10% energy savings. Debt funding up to 75% of project cost qualifies, subject to a minimum net borrowing interest rate of 2%.
Brass, Bricks, Ceramic, Chemical, Fishery, Food Processing, Forging, Foundry, Glass & Refractory, Leather, Paper, Pharma, Steel Re-rolling, Textile
Participating Financial Institutions Under ADEETIE
ADEETIE interest subvention is routed through participating financial institutions under the scheme. The official ADEETIE portal maintains the live list of Scheduled Commercial Banks, NBFCs and Development Financial Institutions; applicants should verify the current list before applying.
Category 1: Scheduled Commercial Banks
Category 2: NBFCs & Development Financial Institutions
Reference snapshot only: participating financial institutions may change over time. Verify the live list on the official ADEETIE portal before applying: adeetie.beeindia.gov.in/registered-fis
60 Eligible Industrial Clusters (Phase 1)
Phase 1 covers 60 industrial clusters across India. Cluster names and spellings vary across some BEE scheme materials, so this table is a reference aid rather than a legal or final list. Applicants should verify the latest eligible-cluster list on the official ADEETIE portal before applying.
Energy-Efficient Technologies Under ADEETIE (Illustrative Examples)
- Textile: Air compressors, humidification systems and Variable Frequency Drives (VFDs). Actual savings depend on the baseline and project design.
- Foundry: Induction melting furnaces, heat-treatment ovens and recuperators. Actual savings depend on the baseline and project design.
- Chemical: Heat exchangers, distillation-column optimisation and pumping systems. Actual savings depend on the baseline and project design.
- Food Processing: Cold-storage optimisation, boiler upgrades and solar-thermal applications. Actual savings depend on the baseline and project design.
- Paper: Efficient dryers, waste-heat recovery and boiler-efficiency systems. Actual savings depend on the baseline and project design.
- Brick / Ceramic: Tunnel kilns, vertical-shaft brick kilns and zigzag technology. Actual savings depend on the baseline and project design.
Minimum Energy Savings Requirement
Projects must achieve and sustain at least 10% energy savings to remain eligible for annual interest subvention. Post-implementation monitoring and verification is used to verify sustained savings.
How GetMyCA Helps You Claim ADEETIE Subvention
Why Choose GetMyCA?: End-to-end ADEETIE support free eligibility check to final disbursement
Free Eligibility Check
We verify your Udyam registration, cluster location, and sector eligibility in 24 hours. No obligation, no fee.
EOI Filing Support
Our experts help register and submit the required project and Expression of Interest (EOI) details through the ADEETIE scheme portal at
adeetie.beeindia.gov.in. For assistance, the BEE Facilitation Centre may be contacted.
IGEA Arrangement
We connect you with BEE-empanelled Certified Energy Auditors immediately for the mandatory Investment Grade Energy Audit.
DPR Preparation
We prepare your Detailed Project Report (DPR) per BEE guidelines includes technology selection, cost estimates, and energy savings projections.
Bank Liaison
We coordinate with participating financial institutions under ADEETIE for loan appraisal and sanction within the eligible range of ₹10 lakh to ₹15 crore.
Post-implementation MRV Support
We help you document energy savings for post-implementation monitoring, reporting and verification. Interest subvention is annual and depends on sustained energy-saving conditions; it is not based on a fixed two-tranche model.
GetMyCA indicative service estimate: approximately 60–90 days, subject to IGEA/DPR completion, portal processing and the lending institution’s appraisal and sanction timeline. This is not a statutory ADEETIE approval deadline.
Documents Required for ADEETIE Application
- Udyam Registration Certificate (URC)
- GST, PAN, KYC or financial documents, as applicable to the portal or participating lending institution
- Expression of Interest (EOI) Form
- Investment Grade Energy Audit (IGEA) Report
- Detailed Project Report (DPR)
- Equipment Quotations / Purchase Orders
- Installation & Commissioning Certificate
- Recent Audited Financial Statements
- Bank Loan Sanction Letter from RFI
- Bank Statements (last 6 months)
- Post-implementation M&V/MRV records, as applicable for verification of sustained energy savings
Don’t Miss Your ADEETIE Interest Subvention!
Check eligibility for 5% interest subvention for Micro and Small enterprises or 3% for Medium enterprises on eligible energy-efficiency projects. Phase 1 covers 60 clusters in 14 sectors, with an additional 100 clusters envisaged in Phase 2.
ADEETIE Scheme FAQs 2026
What is the full form of ADEETIE?+
ADEETIE stands for Assistance in Deploying Energy Efficient Technologies in Industries & Establishments. Some official BEE material also uses the wording Assistance for Deployment of Energy Efficient Technologies in Industrial Establishments.
Which ministry launched ADEETIE, and who implements it?+
ADEETIE is a Ministry of Power scheme implemented by the Bureau of Energy Efficiency (BEE).
Who launched the ADEETIE Scheme, and when and where was it launched?+
Union Minister Shri Manohar Lal launched the ADEETIE Scheme on 15 July 2025 at Arya (P.G.) College, Panipat, Haryana.
Who is eligible for the ADEETIE Scheme?+
Eligible applicants are Udyam-registered MSMEs in the designated Phase 1 clusters and eligible sectors undertaking a new energy-efficiency project, using an eligible loan through a participating financial institution under ADEETIE, and meeting the scheme’s energy-saving conditions. Phase 1 covers 60 clusters in 14 sectors, and an additional 100 clusters are envisaged in Phase 2.
What is the eligible loan amount and interest subvention under ADEETIE?+
The eligible loan range is ₹10 lakh to ₹15 crore. The scheme provides 5% interest subvention for Micro and Small enterprises and 3% for Medium enterprises for three years irrespective of loan tenure. Debt funding up to 75% of project cost qualifies, subject to a minimum net borrowing interest rate of 2%.
Who is not eligible for ADEETIE interest subvention?+
A project already implemented, a refinanced project, a project already benefited under another scheme, and a loan account declared NPA are not eligible for ADEETIE interest subvention under the stated scheme conditions. Projects must also achieve and sustain at least 10% energy savings to remain eligible for annual interest subvention.
Accuracy note: RFI participation, cluster names and technology examples can change over time. Before publishing future updates, re-check the official ADEETIE portal and BEE scheme material. The 60–90 day timeline is a GetMyCA service estimate, not a statutory processing period.